DOE EPSCoR Proposal

From New IAC Wiki
Revision as of 00:44, 14 June 2007 by Oborn (talk | contribs) (→‎Year 2)
Jump to navigation Jump to search

A Positron Source for JLAB

Year 1

  1. Check positron productions efficiency simulations for 10-20 MeV electrons on Tungsten Target
  2. Measure positron emmitance and compare to simulation predictions
  3. Repeat above measurements at different tilt angles

Year 2

  1. Use Genetic algoithm with Simulation predictions to optimize positron production
  2. CEBAF can accept particles into acceleration stage as long as [math]\frac{\Delta E}{E} leq 10^{-5}[/math]

Year 3