Difference between revisions of "Cosmic Ray Shielding Test"

From New IAC Wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
=Lead Between Two Detectors=
 
=Lead Between Two Detectors=
 
In this test, we put some layers (thickness) of lead between two detectors to test how much lead to we need to shield comics rays. We will do coincidence of signals from two detectors. If we can see coincident signal, that means cosmic rays can go through those
 
layers of lead between them.  We will start from 2 layers of lead, then increase by 1 layer.
 
  
  
Line 9: Line 6:
 
|-
 
|-
 
|Layers of lead
 
|Layers of lead
|# of coincidences/min
+
|counts/min
 
|-
 
|-
 
| ||   
 
| ||   

Revision as of 11:20, 29 August 2008

Lead Between Two Detectors

Layers of lead counts/min