(Created page with "=runs= ==05/16/17== An OR between two 4 in. X 4 in. scintillators, placed 5 in above and below the Cf252 source, serve as the TDC start. The TDC start scintilators are connected…")
 
Line 1: Line 1:
 
=runs=
 
=runs=
 
==05/16/17==
 
==05/16/17==
An OR between two 4 in. X 4 in. scintillators, placed 5 in above and below the Cf252 source, serve as the TDC start. The TDC start scintilators are connected to the CFD with a HV of -1700 V and a treshold of 172 mV.
+
Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.

Revision as of 02:30, 17 May 2017

runs

05/16/17

Two 4 in. by 4 in. scintillators, both placed 5 in from the Cf252 source, with one directly above and the other directly below the source. An OR between these two scinilators serves as the TDC start. The two TDC start scintilators are connected to the CFD with a HV of -1700 V and a threshold of 172 mV.