Difference between revisions of "CH Task List"

From New IAC Wiki
Jump to navigation Jump to search
Line 26: Line 26:
  
 
* Linked manual for HPGe detector to wiki pages (X)
 
* Linked manual for HPGe detector to wiki pages (X)
 +
 +
* Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify.
  
  
 
----
 
----
 
[[PAS_Experiment]]
 
[[PAS_Experiment]]

Revision as of 00:54, 5 June 2021

Notes from biweekly meetings

5/27/21

To do list

  • Add dual timer configuration to plateau page (X)
  • Continue to fine tune operating point of NaI detector and upload plateaus/signal:noise plots
  • NaI attenuation measurements (with BorAl and try different types of poly (unborated, lavender, green))
  • Begin experimental setup in clean room (X)
  • Find signal to noise ratio
  • Test HPGe detector
  • Complete latest assigned training module (X)
  • Speak to Roy Dunker who has agreed to let us use a second HPGe detector for back-to-back measurements in later phase of feasibility studies at ISU (X)
  • How much lead to shield 200KeV gamma? How much poly to thermalize 2MeV neutrons? (DD generator shielding)
  • Move painted lead bricks to clean room (X)
  • Linked manual for HPGe detector to wiki pages (X)
  • Rerun 1000V source in plateau data, looks like a discontinuity in the data set starting at the 150mV threshold. Could be my mistake, need to verify.



PAS_Experiment