* Finished collection and analysis of NaI detector plateau measurements, voltages ranging from 700V to 1400V
 
* Finished collection and analysis of NaI detector plateau measurements, voltages ranging from 700V to 1400V
  
** Analysis included Souce in & Source out plots, Signal:Noise, and background subtracted plots
+
* Analysis included Souce in & Source out plots, Signal:Noise, and background subtracted plots
  
 
==6/9/21==
 
==6/9/21==

Revision as of 23:56, 25 June 2021

Timeline

This page will be used to document when each task is completed as a master reference for all work logged in the wiki. The plan is to make things easier when I need to pull things in the future.

May

5/10/21

  • Attended intern orientation for first day at INL
  • Completed training this week as well as began NaI plateau setup

5/18/21

  • Began data collection for NaI plateau and operating point measurements
  • Began writing analysis code for NaI plateau measurements

June

6/8/21

  • Finished collection and analysis of NaI detector plateau measurements, voltages ranging from 700V to 1400V
* Analysis included Souce in & Source out plots, Signal:Noise, and background subtracted plots

6/9/21

  • Began data colleciton for He3 Borated Poly attenuation study

6/11/21

  • Finished data collection for He3 Borated Poly attenuation study
  • Began writing analysis code for Borated Poly attenuation study

6/22/21

  • Finished writing analysis code for He3 Borated Poly attenuation measurements and submitted plot to Paul

6/25/21

  • Began BorAl attenuation measurements including overnight background runs