Beam Text May 17 2012

From New IAC Wiki
Jump to navigation Jump to search

Preparation

[Check List]

0. MATLAB emittance analysis: (working?)

1. Magnets: --Working

2. Camera: (a)--Working, (b)--shielding-good,(c) Sync?

3. Flags: --Working

4. Farady Cup: hocked up?

5. Blank off for camera on?

6. Gas bottle for valve full? --Yes

7. Gas bottle for flags full? --Yes

8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline: