Beam Test Jul 25 2012

From New IAC Wiki
Revision as of 19:17, 25 July 2012 by Setisadi (talk | contribs) (→‎Tune)
Jump to navigation Jump to search

Tune

Energy Switch Out (High En)
Solenoid 1 9.1 A
Solenoid 2 1.3 A
Gun Hor -0 A
Gun Ver +0.1 A
Output Hor -0.3 A
Output Ver -0 A
Rep Rate 11
Gun HV 10 (Knob Setting)
Gun Grid Voltage 10 (Knob Setting)
RF frequency 2856.323 MHz
Modulator HV Power Supply 4.19 (Knob Setting)
RF macro Pulse Length (FWHM) 300 ns
Q1 (A) -3
Q2 (A) +0.8
Q3 (A) +2
Q4 (A) -2
Q5 (A) +0.8
Q6 (A) +2
Current at FC0 90 mA

e-

quad settings after T1 (Target 1, positron production target).

D1   D2      q4     q5    q6     q7    q8     q9     q10        
4.2  4.41    +6.5   -3.7  -1.1   +1.5  +0.2   +0.3   +0.0

e+

quad settings after T1 (Target 1, positron production target).

D1     D2      q4     q5    q6     q7    q8     q9     q10        
-4.2  -4.41    -6.5   +3.7  +1.1   -1.5  -0.2   -0.3   -0.0

DAQ runs

run# T1 T2H V-DL   HV-DR Reprate start     end
3663 in in  1060V  1080V 11      13:02:08