Difference between revisions of "Beam Test Jul 24 2012"

From New IAC Wiki
Jump to navigation Jump to search
Line 52: Line 52:
  
  
run# Source HV-DL HV-DR  start-time end-time
+
run# Source HV-DL HV-DR  start-time end-time
 
  3659  Na-22 1150V 1150V  20:56:28  21:17:04
 
  3659  Na-22 1150V 1150V  20:56:28  21:17:04
 
  3660  Na-22 1200V 1200V  21:19:12
 
  3660  Na-22 1200V 1200V  21:19:12

Revision as of 04:07, 25 July 2012

Energy Switch Out (High En)
Solenoid 1 6.7 A
Solenoid 2 1.5 A
Gun Hor +0.3 A
Gun Ver -0 A
Output Hor -0.4 A
Output Ver +0 A
Rep Rate 11
Gun HV 10 (Knob Setting)
Gun Grid Voltage 2.85 (Knob Setting)
RF frequency 2856.243 MHz
Modulator HV Power Supply 4.19 (Knob Setting)
RF macro Pulse Length (FWHM) 300 ns
Q1 (A) -2
Q2 (A) +0.8
Q3 (A) +2
Q4 (A) -2
Q5 (A) +0.8
Q6 (A) +2
Current at FC0 32 mA

Calibration runs with sources

run# Source HV-DL HV-DR Pulser-period start-time end-time
3553  Na-22 1082V 1223V 20 micro-sec  19:01:34   19:58:29
3554  Na-22 1082V 1223V 5  micro-sec  20:00:50   20:11:32
3557  Na-22 1082V 1223V 10 micro-sec  
3558  Na-22 1082V 1223V 10 micro-sec  
3559  Na-22 1150V 1150V 10 micro-sec


run# Source HV-DL HV-DR  start-time end-time
3659  Na-22 1150V 1150V  20:56:28   21:17:04
3660  Na-22 1200V 1200V  21:19:12