Beam Test Apr 24 2012

From New IAC Wiki
Revision as of 16:43, 16 April 2012 by Setisadi (talk | contribs) (Created page with '= Getting Ready Punchlist = 1) Get matlab ready for emittance measurement. 2) Install control box. 3) Clean up imaging system. 4) Determine dipole current setting. = Emittance T…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Getting Ready Punchlist

1) Get matlab ready for emittance measurement. 2) Install control box. 3) Clean up imaging system. 4) Determine dipole current setting.

Emittance Test