Difference between revisions of "AW CLAS12R1"

From New IAC Wiki
Jump to navigation Jump to search
Line 10: Line 10:
 
:Worked with Haitham on Sector 5
 
:Worked with Haitham on Sector 5
 
:Moved Kraken to SL2
 
:Moved Kraken to SL2
:Began confirming signals on S5 sense wires [https://wiki.iac.isu.edu/index.php/S5_Testing_and_Performance_Summary]
+
:Began confirming signals on S5 sense wires [[S5 Testing and Performance Summary]]
 
:Add missing oscilloscope image SL2-STB6-K1200872 U10
 
:Add missing oscilloscope image SL2-STB6-K1200872 U10
 
:Confirmed with Haitham that HV burin is completed for SL2
 
:Confirmed with Haitham that HV burin is completed for SL2
Line 20: Line 20:
 
:W,F 12-5
 
:W,F 12-5
  
[[S5 Testing and Performance Summary]]
+
 
 
Weekly progress meeting at 10 am Mondays
 
Weekly progress meeting at 10 am Mondays
  
 
[[CLAS12_R1]]
 
[[CLAS12_R1]]

Revision as of 16:19, 11 November 2013

11/1/2013

Goals
  1. Confirm signals on all of Sector 5's sense wires
  2. Finish HV burnin: S:F:G = 1500:-750:536 and the current draw is less than 1 uA CLAS12_R1_S5_QA
  3. After the above is completed, stop gas flow, Install dust covers, prepare for shipping
  4. Test TDC integrity using DAQ and S1
11/8/2013
Worked with Haitham on Sector 5
Moved Kraken to SL2
Began confirming signals on S5 sense wires S5 Testing and Performance Summary
Add missing oscilloscope image SL2-STB6-K1200872 U10
Confirmed with Haitham that HV burin is completed for SL2
Rotated Sector 3 with David
Available times
Monday 9-5
T,Th 9-3
W,F 12-5


Weekly progress meeting at 10 am Mondays

CLAS12_R1