Difference between revisions of "201403 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
#remove chamber from clean room Sunday
 
#remove chamber from clean room Sunday
 
#Get shipping pallets for lifts, A-frames, the last chamber, and small equipment
 
#Get shipping pallets for lifts, A-frames, the last chamber, and small equipment
#Schedule pickup for Friday march 28 so the chamber arrives at JLab during the following week
+
#Schedule pickup for Friday March 28 so the chamber arrives at JLab during the following week
  
  
 
Plan is to wire wrap, install boards, HV test to 100 Volts in air, and install board covers.
 
Plan is to wire wrap, install boards, HV test to 100 Volts in air, and install board covers.
 +
 +
 +
Get Carriage bolts for drift chamber lifting frame
 +
 +
Check that brass screws for windows are in.
 +
 +
  
 
[[CLAS12_R1_Progress_Reports#February_2014]]
 
[[CLAS12_R1_Progress_Reports#February_2014]]

Revision as of 16:37, 7 March 2014

March 7 2014

  1. Delays prevented Windows from being installed. They should be installed this weekend.
  2. Final plugs and standoffs will be glued in today
  3. remove chamber from clean room Sunday
  4. Get shipping pallets for lifts, A-frames, the last chamber, and small equipment
  5. Schedule pickup for Friday March 28 so the chamber arrives at JLab during the following week


Plan is to wire wrap, install boards, HV test to 100 Volts in air, and install board covers.


Get Carriage bolts for drift chamber lifting frame

Check that brass screws for windows are in.


CLAS12_R1_Progress_Reports#February_2014