Carlos:  analyze cosmic data
 
Carlos:  analyze cosmic data
  
 +
 +
=6/6/13=
 +
 +
Dion: String S3 with Debbie
 +
 +
Haitham: String S2 with David
 +
 +
David: String S2 with Haitham (left early)
 +
 +
Debbie: string S3 with Dion
 +
 +
Carlos:  analyze cosmic data
  
 
=6/10/13=
 
=6/10/13=

Revision as of 17:35, 10 June 2013

6/3/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham

Debbie: string S3 with Dion

Carlos: analyze cosmic data


6/4/13

Dion: Look for S5 signals then String S3 with Debbie in the afternoon

Haitham: String S2 with David

David: String S2 with Haitham then look for S5 signals

Debbie: Organize work area in the morning string S3 with Dion in the afternoon

Carlos: analyze cosmic data

Changed flow rate from 30 down to 50.

6/5/13

Dion: bring shipping crates from airport then String S3 with Debbie in the afternoon

Haitham: String S2 with David

David: String S2 with Haitham (left early)

Debbie: bring shipping crates from airport in the morning string S3 with Dion in the afternoon

Carlos: analyze cosmic data


6/6/13

Dion: String S3 with Debbie

Haitham: String S2 with David

David: String S2 with Haitham (left early)

Debbie: string S3 with Dion

Carlos: analyze cosmic data

6/10/13

Dion: String S2 & S3 with Debbie

Haitham: DC pictures

David: sick day

Debbie: String S2 & S3 with Dion

Carlos: Tension measurements & analyze cosmic data

S3: on Field row 154

S2: on Field row 161