Difference between revisions of "201303 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
 
(13 intermediate revisions by 2 users not shown)
Line 67: Line 67:
 
Carlos: Wire tension measurements & ADB crate install
 
Carlos: Wire tension measurements & ADB crate install
  
=3/19/13=
+
=3/20/13=
  
Dion: String S2 Field with David in the morning then switch to S3 after Debbie arrives
+
Dion: String S2 Field with David  
  
David: String S2 with Dion then S3 Field
+
David: String S2 with Dion  
  
Debbie: String S2 after arriving late
+
Debbie: sick day
 
Haitham: Look for signals on S6 then String Field S2 when Debbie arrives
 
Haitham: Look for signals on S6 then String Field S2 when Debbie arrives
  
 
Carlos: Wire tension measurements & ADB crate install
 
Carlos: Wire tension measurements & ADB crate install
  
 +
 +
=3/21/13=
 +
 +
Dion: String S3 Field with David
 +
 +
David: String S3 with Dion
 +
 +
Debbie: String S2 Field
 +
 +
Haitham: String Field S2
 +
 +
Carlos: Wire tension measurements & ADB crate install
 +
 +
=3/25/13=
 +
 +
Dion: String S3 Field with David , finish 2nd HV octopus & install on S1, continue ribbon HV cable
 +
 +
David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
 +
 +
Haitham: String S2 with Debbie
 +
 +
Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
=3/26/13=
 +
 +
Dion: String S3 Field with David , continue ribbon HV cable
 +
 +
David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
 +
 +
Haitham: String S2 with Debbie
 +
 +
Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
=3/27/13=
 +
 +
Dion: String S3 Field with David , continue ribbon HV cable (the Cracken)
 +
 +
David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon
 +
 +
Haitham: String S2 with Debbie
 +
 +
Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels
 +
 +
Confirmed mapping of ADB input channels on front to ECL output on the back:
 +
 +
{| border="1"  |cellpadding="20" cellspacing="0
 +
|-
 +
| Input || Output
 +
|-
 +
| 1-16 || 1-16
 +
|-
 +
| 17-24 || 17-24
 +
|-
 +
| 49-56 || 25-32
 +
|-
 +
| 81-96 || 33-48
 +
|-
 +
 +
|}
  
 
[[CLAS12_R1_Progress_Reports]]
 
[[CLAS12_R1_Progress_Reports]]

Latest revision as of 21:34, 27 March 2013

3/4/13

Dion: String S3 with David

David: Stringing S3 Guard

Debbie: String S2 in the morning, HV burn in S6 in the afternoon

Haitham: String Guard on S2

Carlo: HV burn in & signal search S6


Progress: A super layer of guard wires has been strung on both S2 & S3. Should be finished with Guard wires by next week

3/5/13

Dion: String S3 with David

David: Stringing S3 Guard

Debbie: String S2 in the morning, HV burn in S6 SL2-HVB6 in the afternoon

Haitham: String Guard on S2

Carlo: HV burn in SL2-HVB6

3/7/13

Signals observed on all channels of S2 SL2 HVB5.

3/11/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, HV burn in S6 SL2-HVB5 in the afternoon

Haitham: String Field S2

Carlo: HV burn in SL2-HVB5

3/18/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, Look for signals on STB5

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate checkout

3/19/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, Debbie needs time off after lunch

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate install

3/20/13

Dion: String S2 Field with David

David: String S2 with Dion

Debbie: sick day Haitham: Look for signals on S6 then String Field S2 when Debbie arrives

Carlos: Wire tension measurements & ADB crate install


3/21/13

Dion: String S3 Field with David

David: String S3 with Dion

Debbie: String S2 Field

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate install

3/25/13

Dion: String S3 Field with David , finish 2nd HV octopus & install on S1, continue ribbon HV cable

David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels

3/26/13

Dion: String S3 Field with David , continue ribbon HV cable

David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels

3/27/13

Dion: String S3 Field with David , continue ribbon HV cable (the Cracken)

David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels

Confirmed mapping of ADB input channels on front to ECL output on the back:

Input Output
1-16 1-16
17-24 17-24
49-56 25-32
81-96 33-48

CLAS12_R1_Progress_Reports