=3/25/13=
 
=3/25/13=
  
Dion: String S3 Field with David , finish 2nd HV octopus & install on S1
+
Dion: String S3 Field with David , finish 2nd HV octopus & install on S1, continue ribbon HV cable
  
 
David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels
 
David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels

Revision as of 20:17, 25 March 2013

3/4/13

Dion: String S3 with David

David: Stringing S3 Guard

Debbie: String S2 in the morning, HV burn in S6 in the afternoon

Haitham: String Guard on S2

Carlo: HV burn in & signal search S6


Progress: A super layer of guard wires has been strung on both S2 & S3. Should be finished with Guard wires by next week

3/5/13

Dion: String S3 with David

David: Stringing S3 Guard

Debbie: String S2 in the morning, HV burn in S6 SL2-HVB6 in the afternoon

Haitham: String Guard on S2

Carlo: HV burn in SL2-HVB6

3/7/13

Signals observed on all channels of S2 SL2 HVB5.

3/11/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, HV burn in S6 SL2-HVB5 in the afternoon

Haitham: String Field S2

Carlo: HV burn in SL2-HVB5

3/18/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, Look for signals on STB5

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate checkout

3/19/13

Dion: String S3 Field with David

David: Stringing S3 Field

Debbie: String S2 in the morning, Debbie needs time off after lunch

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate install

3/20/13

Dion: String S2 Field with David

David: String S2 with Dion

Debbie: sick day Haitham: Look for signals on S6 then String Field S2 when Debbie arrives

Carlos: Wire tension measurements & ADB crate install


3/21/13

Dion: String S3 Field with David

David: String S3 with Dion

Debbie: String S2 Field

Haitham: String Field S2

Carlos: Wire tension measurements & ADB crate install

3/25/13

Dion: String S3 Field with David , finish 2nd HV octopus & install on S1, continue ribbon HV cable

David: String S3 Field with Dion , use STB + pulse generator to inject signals and test ADC->TDC channels

Debbie: String S2 Field with Haitham, Document S6 signals in the afternoon

Haitham: String S2 with Debbie

Carlos: Wire tension measurements & use STB + pulse generator to inject signals and test ADC->TDC channels