Difference between revisions of "201207 R1ProgressRep"

From New IAC Wiki
Jump to navigation Jump to search
Line 22: Line 22:
  
 
Completed weekly Tension Trend Tests for both Sector 5 and Sector 6.
 
Completed weekly Tension Trend Tests for both Sector 5 and Sector 6.
 +
 +
 +
=7/9/12=
 +
 +
Strung 84 Field wires on Sector 5 (now on SL2 - row 121).
 +
 +
Strung 36 Sense wires on Sector 6 (now on SL2 - row 24).

Revision as of 13:09, 11 July 2012

7/2/12

Strung 84 Field wires on Sector 5 (now on SL2 - row 91). Removed pretensioner C3 at row 88.

Strung 41 Field wires on Sector 6 (SL1 Fields are now complete). Removed pretensioner C7 at row 228.

Began visual inspection of Sector 6 before rotation.


7/3/12

Strung 84 Field wires on Sector 5 (now on SL2 - row 103).

Completed visual inspection of Sector 6. Rotated chamber, leveled stringing machine, repositioned magnet and aligned chamber for stringing Sense wires in SL2.


7/5/12

Strung 42 Field wires on Sector 5 (now on SL2 - row 111). Removed pretensioner R3 at row 104.

Strung 25 Sense wires on Sector 6 (now on SL2 - row 12).

Completed weekly Tension Trend Tests for both Sector 5 and Sector 6.


7/9/12

Strung 84 Field wires on Sector 5 (now on SL2 - row 121).

Strung 36 Sense wires on Sector 6 (now on SL2 - row 24).