==11/8/11==
 
==11/8/11==
  
Chamber was rotated this morning. We started stringing SL1.
+
Chamber was rotated this morning.
 +
 
 +
We started stringing SL1 mid-afternoon.  We only managed 50 wires today.
  
 
[[file:20111108_Temp1.png | 400 px]]
 
[[file:20111108_Temp1.png | 400 px]]
 +
 +
Temperature drop was caused by our power supply overheating.  For future reference, don't exceed the rated 60 Amps of current...

Revision as of 23:51, 8 November 2011

11/1/11

70 wires were strung today. Our second stringer should be starting tomorrow.

11/2/11

91 wires were strung today.

20111102 Temp1.png

11/3/11

The correct HVAC filters came in today. A clean filter was installed today at ~10 AM. A small rise in temperature can be seen in the temperature graph when this change was made.

77 wires were strung today.

20111103 Temp1.png

11/4/11

91 wires were strung today.

All field wires are strung on SL2.

20111104 Wires.png

20111104 Temp2.png

11/7/11

Spent the day visually inspecting for crossed wires. We should have the chamber rotated tomorrow and hopefully back to stringing later in the afternoon.

20111107 Temp1.png

11/8/11

Chamber was rotated this morning.

We started stringing SL1 mid-afternoon. We only managed 50 wires today.

20111108 Temp1.png

Temperature drop was caused by our power supply overheating. For future reference, don't exceed the rated 60 Amps of current...