12 10 2012 HRRL DetectorTests

From New IAC Wiki
Revision as of 21:17, 19 December 2012 by Foretony (talk | contribs) (→‎12/19/12)
Jump to navigation Jump to search

12/12/12

Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.

HRRL_Dec_12_2012Run

12/13/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_13_2012Run


12/14/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_14_2012Run

12/19/12

When Target T1 goes in and Accelerator side lights up( as viewed by scintillator Kelly) and Illyusha (when next to the beam exit window) also lights.

There is no Pb around T1.

Lets directionally shield Illyusha (when positioned next to the hallway) to determine how much lead to add around T1.

Area Conditions
800 \pm 130 pVs No shielding T1 in
1600 \pm 200 pVs 1 Pb brick (2") shielding T1 in Add Pb and signal goes up? Just noise!
Move Illyusha so it is right next to experimental side flag, no shielding.