12 10 2012 HRRL DetectorTests

From New IAC Wiki
Revision as of 04:53, 14 December 2012 by Foretony (talk | contribs) (→‎12/12/12)
Jump to navigation Jump to search

12/12/12

Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line. HRRL_Dec_12_2012Run

12/13/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_13_2012Run