Difference between revisions of "12 10 2012 HRRL DetectorTests"

From New IAC Wiki
Jump to navigation Jump to search
Line 8: Line 8:
  
 
https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_27_2012#Tune
 
https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_27_2012#Tune
 +
 +
==Measure Emmitance==
  
 
==Ilyusha Background measurements==
 
==Ilyusha Background measurements==

Revision as of 00:17, 8 December 2012

RunPlan

BeamTune

Tune beam into zero line, max current, 10.5 MeV energy, 20 ns width, 300 Hz rep rate

For Reference, below is the the tune used on last day of July 2012 Positron run

https://wiki.iac.isu.edu/index.php/Beam_Test_Jul_27_2012#Tune

Measure Emmitance

Ilyusha Background measurements

HV=1000 CFD = -12 mV


Previous run during neutron correlation experiment found 1 gamma/15 electron beam pulses

Tune beam into zero line, max current, 10.5 MeV energy, 20 ns width, 300 Hz rep rate

1.) Take a run with no shielding around Ilyusha

2.) Move Pb bricks around the scintillator to determine direction of background

3.) add shielding to accelerator