Difference between revisions of "12-23-2016"

From New IAC Wiki
Jump to navigation Jump to search
 
(14 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
+
Determine impact of Cf source on HpGe detector ([[Fast neutron damage to HPGe Detector|see this page]]).  A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.   
Determine impact of Cf source on HpGe detector.  A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.   
 
  
 
{| border="1"
 
{| border="1"
! Run # !! Configuration
+
! Run # !! RunTime (sec) !! Configuration
 +
|-
 +
|5598 || 6  || PAA configuration  10 uCi Na-22 and Co-60 source 32 cm from HpGe face
 +
|-
 +
|5599 ||  11 ||PAA configuration  Thorium welding rods on HpGe Face
 
|-
 
|-
|5598 || PAA configuration  10 uCi Na-22 and Co-60 source 32 cm from HpGe face
+
|5600 ||  9 ||PAA configuration  Thorium welding rods on HpGe Face changed threshold from 48 to 57 mV on HpGe trigger
 
|-
 
|-
|5599 || PAA configuration  Thorium welding rods on HpGe Face
+
|5602 ||  157 ||PAA configuration  Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 4 minute run?, 450 Hz
 +
|-
 +
|5603 || 163  ||PAA configuration  Cf source on paperclip, '''Poly is out''', HpGe face is 50 cm from Cf source, 4 minute run , 450 Hz  [[File:r5602-5603Overlay.png | 100 px]]
 +
|-
 +
|5607 ||  980 ||FF configuration  Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, double coincidence between HpGE and small Scint, 5 Hz
 +
|-
 +
|5606 ||  562|| FF configuration  Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 4 minute run , double coincidence between HpGE and small Scint
 
|-
 
|-
 
|}
 
|}
 +
 +
 +
FF->Draw("PADC.PADC785N[3]>>r5602(4096.0.4096)")
 +
 +
FF->Draw("PADC.PADC785N[3]>>r5602N(4096.0.4096)","1/157")
 +
 +
 +
<pre>
 +
Run 5569
 +
 +
PADC.PADC785N[15]=78
 +
ADC End of Block        fc0002b0        Event#688
 +
ADC End of Block        fc00026d        Event#621
 +
ADC Ch:0        valid=0 value=0 0
 +
PADC.PADC785N[0]=0
 +
 +
</pre>
  
 
[[2nCor_44#Run_Plan]]
 
[[2nCor_44#Run_Plan]]

Latest revision as of 20:00, 3 January 2017

Determine impact of Cf source on HpGe detector (see this page). A measurement was done previously with the Cf source and another HpGe detector for 30 minutes.

Run # RunTime (sec) Configuration
5598 6 PAA configuration 10 uCi Na-22 and Co-60 source 32 cm from HpGe face
5599 11 PAA configuration Thorium welding rods on HpGe Face
5600 9 PAA configuration Thorium welding rods on HpGe Face changed threshold from 48 to 57 mV on HpGe trigger
5602 157 PAA configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 4 minute run?, 450 Hz
5603 163 PAA configuration Cf source on paperclip, Poly is out, HpGe face is 50 cm from Cf source, 4 minute run , 450 Hz R5602-5603Overlay.png
5607 980 FF configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, double coincidence between HpGE and small Scint, 5 Hz
5606 562 FF configuration Cf source on paperclip, 21 cm of Poly on front HpGe face, HpGe face is 50 cm from Cf source, 4 minute run , double coincidence between HpGE and small Scint


FF->Draw("PADC.PADC785N[3]>>r5602(4096.0.4096)")

FF->Draw("PADC.PADC785N[3]>>r5602N(4096.0.4096)","1/157")


Run 5569

PADC.PADC785N[15]=78
ADC End of Block        fc0002b0        Event#688
ADC End of Block        fc00026d        Event#621
ADC Ch:0        valid=0 value=0 0
PADC.PADC785N[0]=0

2nCor_44#Run_Plan