Difference between revisions of "10-31-08 GEM HRRL Photon Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 148: Line 148:
  
 
{| border="3"  cellpadding="20" cellspacing="0"
 
{| border="3"  cellpadding="20" cellspacing="0"
| Run Number || Distance(cm) || Strip 13 Rate X 1000(per event <math>\times</math>)|| Hisogram || Histogram(Zoomed In)
+
| Run Number || Distance(cm) || Strip 13 Rate X 1000(per event <math>\times</math>)||Strip 13 Rate X 1000(per event <math>\times</math>)|| Hisogram || Histogram(Zoomed In)
 
|-
 
|-
| 1|| 63 || 134.0 || [[Image:GEM_HRRL_Strip13_run1_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run1_10-31-08_1.jpg|100px]]
+
| 1|| 63 || 134.0 || 3678 || [[Image:GEM_HRRL_Strip13_run1_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run1_10-31-08_1.jpg|100px]]
 
|-
 
|-
 
| 2|| 63 ||  ||  ||  
 
| 2|| 63 ||  ||  ||  
Line 160: Line 160:
 
| 5|| 22 ||  ||  ||
 
| 5|| 22 ||  ||  ||
 
|-
 
|-
| 6|| 43 || 143.3 || [[Image:GEM_HRRL_Strip13_run6_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run6_10-31-08_1.jpg|100px]]
+
| 6|| 43 || 143.3 || 4137 || [[Image:GEM_HRRL_Strip13_run6_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run6_10-31-08_1.jpg|100px]]
 
|-
 
|-
| 7|| 33 || 155.5 || [[Image:GEM_HRRL_Strip13_run7_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run7_10-31-08_1.jpg|100px]]
+
| 7|| 33 || 155.5 || 2805 || [[Image:GEM_HRRL_Strip13_run7_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run7_10-31-08_1.jpg|100px]]
 
|-
 
|-
| 8|| 54 || 183.1 || [[Image:GEM_HRRL_Strip13_run8_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run8_10-31-08_1.jpg|100px]]  
+
| 8|| 54 || 183.1 || 5030 || [[Image:GEM_HRRL_Strip13_run8_10-31-08.jpg|100px]] || [[Image:GEM_HRRL_Strip13_run8_10-31-08_1.jpg|100px]]  
|}
+
|}<br>
  
  
  
 
[http://www.iac.isu.edu/mediawiki/index.php/GEM_HRRL_Photons Go back]
 
[http://www.iac.isu.edu/mediawiki/index.php/GEM_HRRL_Photons Go back]

Revision as of 03:38, 1 November 2008

The Goal today is to observe position dependence of photons on the GEM detector


A1 -> 13 A2 -> 11 A3 -> Trig A4 -> 2 A6 -> 16 A7 -> 8 A8 -> 5 A9 -> NaI -> B9


B1 -> ADC1A


Run 0

GEM Backgrnd.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =0

5 minutes long

Run 1

Run1.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


ADC 1D has clear second peak at channel 150 but ADC1 does not. Lets Observe ADC 1D as a function of position. This corresponds to GEM output strip 13.

5 minutes long

Run 2

Run2.mpa

GEM HV : VDrif = 3550, VGem = 3550

HRRL : E = 14 MeV, I =20mA

5 minutes long


I see a second peak on ADC1D but it is at channels 100 and not 150.

Run 3

Run3.mpa

GEM HV : VDrif = 3550, VGem = 3550

HRRL : E = 14 MeV, I =20mA

3 minutes long

Unplug NaI and peak resumes near 150 channels

Run 4

Run4.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now turn the detector on with the beam current on and I see a peak around 150 channels again.

3 minutes long. OOOPPPs left DAQ running while we moved the detector. Only look at first 3 minutes.

Pin 13 was located 63 cm from the mounting bracket horizontal cross bar.

Run 5

Run5.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now move the detector away from the photons.

Pin 13 is a distance of 22 cm from the mounting bar moved 41 cm from its original location at 63 cm

Run 6

Run6.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now move the detector away from the photons.

Pin 13 is a distance of 43 cm from the mounting bar moved 20 cm from its original location at 63 cm

Start 4:36 End 4:39

Run 7

Run7.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now move the detector away from the photons.

Pin 13 is a distance of 33 cm from the mounting bar moved 30 cm from its original location at 63 cm

Start 5:51 End 5:54

Run 8

Run8.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now move the detector away from the photons.

Pin 13 is a distance of 54 cm from the mounting bar moved 9 cm from its original location at 63 cm

Start : 5.03 End : 5:07

Analysis

Background -vs -signal

Position -vs Rate

Run Number Distance(cm) Strip 13 Rate X 1000(per event [math]\times[/math]) Strip 13 Rate X 1000(per event [math]\times[/math]) Hisogram Histogram(Zoomed In)
1 63 134.0 3678 GEM HRRL Strip13 run1 10-31-08.jpg GEM HRRL Strip13 run1 10-31-08 1.jpg
2 63
3 63
4 63
5 22
6 43 143.3 4137 GEM HRRL Strip13 run6 10-31-08.jpg GEM HRRL Strip13 run6 10-31-08 1.jpg
7 33 155.5 2805 GEM HRRL Strip13 run7 10-31-08.jpg GEM HRRL Strip13 run7 10-31-08 1.jpg
8 54 183.1 5030 GEM HRRL Strip13 run8 10-31-08.jpg GEM HRRL Strip13 run8 10-31-08 1.jpg



Go back