Difference between revisions of "10-31-08 GEM HRRL Photon Runs"

From New IAC Wiki
Jump to navigation Jump to search
Line 58: Line 58:
  
 
HRRL : E = 14 MeV, I =20mA
 
HRRL : E = 14 MeV, I =20mA
 +
 +
3 minutes long
 +
 +
Unplug NaI and peak resumes near 150 channels
 +
 +
=Run 4=
 +
 +
Run4.mpa
 +
 +
GEM HV : VDrif = 3850, VGem = 3550
 +
 +
HRRL : E = 14 MeV, I =20mA
 +
 +
 +
Now turn the detector on with the beam current on and I see a peak around 150 channels again.
  
 
5 minutes long
 
5 minutes long
 +
=Run 5=
 +
 +
Run5.mpa
 +
 +
GEM HV : VDrif = 3850, VGem = 3550
 +
 +
HRRL : E = 14 MeV, I =20mA
  
  
 +
Now move the detector away from the photons.
  
 
[http://www.iac.isu.edu/mediawiki/index.php/GEM_HRRL_Photons Go back]
 
[http://www.iac.isu.edu/mediawiki/index.php/GEM_HRRL_Photons Go back]

Revision as of 22:13, 31 October 2008

The Goal today is to observe position dependence of photons on the GEM detector


A1 -> 13 A2 -> 11 A3 -> Trig A4 -> 2 A6 -> 16 A7 -> 8 A8 -> 5 A9 -> NaI -> B9


B1 -> ADC1A


Run 0

GEM Backgrnd.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =0

5 minutes long

Run 1

Run1.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


ADC 1D has clear second peak at channel 150 but ADC1 does not. Lets Observe ADC 1D as a function of position. This corresponds to GEM output strip 13.

5 minutes long

Run 2

Run2.mpa

GEM HV : VDrif = 3550, VGem = 3550

HRRL : E = 14 MeV, I =20mA

5 minutes long


I see a second peak on ADC1D but it is at channels 100 and not 150.

Run 3

Run3.mpa

GEM HV : VDrif = 3550, VGem = 3550

HRRL : E = 14 MeV, I =20mA

3 minutes long

Unplug NaI and peak resumes near 150 channels

Run 4

Run4.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now turn the detector on with the beam current on and I see a peak around 150 channels again.

5 minutes long

Run 5

Run5.mpa

GEM HV : VDrif = 3850, VGem = 3550

HRRL : E = 14 MeV, I =20mA


Now move the detector away from the photons.

Go back