Difference between revisions of "09-07-2017"

From New IAC Wiki
Jump to navigation Jump to search
Line 25: Line 25:
 
| 6524 ||Integral= 280 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes. ||[[File:R6524.png|230px]]  ||
 
| 6524 ||Integral= 280 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes. ||[[File:R6524.png|230px]]  ||
 
|-
 
|-
| 6525 ||Integral= 270 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube, covered hole in beam dump for laser with 2" thick Pb.   ||[[File:R6525.png|230px]]   ||  [[file:R6524-R6525Overlay.png|230px]] || [[File:R6525NoTopBotCoinc.png|230px]]
+
| 6525 ||Integral= 270 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  ||  10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube, covered hole in  
 +
|-
 +
| 6526 ||Integral= 270 pV*s 260 mV peak = 1.1A || '''DU-238 R45020 '''  || 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1350 to 1300 on bottom tube, detector 54 degrees lowered bottom PMT from 1400 to 1350   ||  ||   ||  
 
|}
 
|}
  

Revision as of 19:23, 7 August 2017

2nCor_44#Run_Plan

Run list

Run # Charge/pulse Target Configuration Individual histos + rates overlayed histos no top bottom coin.
6510 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6511 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6512 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6513-6517 Integral= pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz
6518 Integral= pV*s 260 mV peak = 1.1A MT 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz , Faraday cup in place
6519 Integral= pV*s 260 mV peak = 1.1A D20 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz, This D2O target is a vial and not the bottle used previously R6519.png
6521 Integral= 255+-15 pV*s 260 mV peak = 1.1A Al 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz R6521.png
6522 Integral= 255 pV*s 260 mV peak = 1.1A MT 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz R6522.png
6523 Integral= 260 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz R6523.png
6524 Integral= 280 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 54 degrees, lowered HV from 1450 to 1400 on both tubes. R6524.png
6525 Integral= 270 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1400 to 1350 on bottom tube, covered hole in
6526 Integral= 270 pV*s 260 mV peak = 1.1A DU-238 R45020 10.5 MeV (1108 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 180 Hz. For detector at 102 degrees, lowered HV from 1350 to 1300 on bottom tube, detector 54 degrees lowered bottom PMT from 1400 to 1350


2nCor_44#Run_Plan