09-07-2016

From New IAC Wiki
Jump to navigation Jump to search

No target collimator open

Beam Conditions
11.1 MeV , 2 ns pulse width


Run # Configuration
5277 11.1 MeV , 2 ns pulse width , 850 mA , 60 Hz , Collimators wide open , radiator out , Tuning
5286 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Collimators wide open , radiator 3/4" Al , Target is 3/4 thick Al @ 90 degree to beam
5288 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Collimators wide open , radiator Out , Target is 3/4 thick Al @ 90 degree to beam
528 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, Cell side collimator closed , radiator Out , Target is 3/4 thick Al @ 90 degree to beam, Block cell on accelerator side to measure shower from beam dump with max e- hitting dump
block cell , 1" radiator
unblock cell , install 1" radiator

DU cylinder target

Beam Conditions
11.1 MeV , 2 ns pulse width

1” Al radiator, collimator slit open, HV -1700V,*Find lowest thresholds to run.

Study forward detector gamma flas with Pb curtains

Thorium strip, collimator squeeze down.

No target run

Determine how many fissions per pulse.

run 1 mg HEU to see (probably miserable) rates

Exploratory measurements with 47% HEU.

CFD studies

P.S. sweep magnet in/out

Long run on Thorium

Long run on 1 mg HEU