08/21-22/13

From New IAC Wiki
Revision as of 14:44, 2 October 2013 by Abdehait (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Wednesday 08/21-22/13

- Detector voltage is 2300, 2800V GEM and Cathode successively. GEM has not any output to the TDC for 5773, 5774.



Run Number Beam Start Time End time Notes
5773 on beam on for 4-10s, overflow
5774 on beam on for 4-10s shutter is close, beam energy is 7.5 MeV
5775 on beam on for 4-10s shutter is open, beam energy is 7.5 MeV
5776 on beam on for 4-10s shutter is open, beam energy is 7.5 MeV
5777 on beam on for 4-10s shutter is close, beam energy is 7.5 MeV
5778 off 19:54:17 6:00:00 shutter is close 2.8, 3.4 G/C, Amp.6_6
5779 off 6:05:33 shutter is open 2.8, 3.4 G/C, Amp.6_6

[1]