Pages that link to "Linac Run Plan April 2018, Dr. McNulty"
Jump to navigation
Jump to search
The following pages link to Linac Run Plan April 2018, Dr. McNulty:
Displayed 10 items.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)- Absorbed Dose Information (← links)
- May 31st 2018 - 25b 0 degree port (← links)
- 100mA, 100ns pulse width, 25cm from beam pipe (← links)
- 25mA, 100ns pulse width, 25cm from beam pipe (← links)
- 25mA, 100ns pulse width, 50cm from beam pipe (← links)
- 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window (← links)
- 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop (← links)
- 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window (← links)
- 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window (← links)
- 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window (← links)