201401 R1ProgressRep

From New IAC Wiki
Revision as of 19:13, 4 January 2014 by Conedavi (talk | contribs)
Jump to navigation Jump to search

Shipping Manifest:

  • Thick plastic window covers used during stringing
  • 1 stringing machine
  • old ADB crate
  • 1 magnet


Order to pull equipment out that requires a crane:

1. magnet 2. palette 3. chamber

Note: Replace right backside wood mounting piece for boarding. Broke the one for S5 packaging and replaced with one from another set.