09/23-27/2013
09/23/13 BeamOn shutter close2.8_3.4kV
ADC : GEM CH#5, Scintillator 11
TDC: GEM CH#27,31 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6087 | on | 11:58:23 | 12:56:30 | , ADC does not collect charge from the scintillator 3.4,2.8kV |
6088 | on | 12:56:58 | beam on, 3.4,2.8kV | |
6089 | on | 13:41:15 | 14:19:01 | , 2.8,2.8kV, run included a beam off then beam on again. |
6090 | on | 14:31:39 | 14:34:45 | 3.4,2.8kV |
6091 | on | 14:36:29 | 15:20:07 | 43' 38" 3.4,2.8kV |
6092 | on | 15:22:16 | 15:41:36 | 19' 20" 3.4,2.8kV |
6093 | on | 15:42:46 | 16:27:24 | 44 38" 3.4,2.8kV |
6094 | on | 16:28:28 | 16:58:48 | 30' 20" 3.4,2.8kV, high sci. voltage that saturate the ADC, b |
09/24/13 BeamOn shutter open 2.8_3.4kV
ADC : GEM CH#5, Scintillator 11
TDC: GEM CH#27,31 (just 31 gives time hits but it is a kind of weird!!!!!), Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6095 | on | 09:49:48 | 10:35:32 | beam turned off twice for a short time |
6096 | on | 10:36:06 | 13:41:58 | scin. ADC signal without Amplification |
6097 | on | 13:42:41 | 16:49:59 | |
6098 | on | 16:50:11 | 17:08:43 |
09/25/13 BeamOn shutter open 3.3,2.7kV
ADC : GEM CH#5, Scintillator 9,11
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6100 | on | 08:17:48 | 08:31:49 | sci. ampl. is changed for qdc. |
6101 | on | 08:48:59 | 09:04:14 | |
6102 | on | 09:08:27 | 09:53:58 | sci. ADC ch#9 |
6103 | on | 09:55:21 | 10:05:19 | beam is off |
6104 | on | 10:06:48 | 10:54:21 | |
6105 | on | 10:55:08 | 11:43:05 | |
6106 | on | 11:44:06 | 13:34:49 | |
6113 | on | 16:28:10 | 16:56:49 | spec. amp. 500 |
09/25/13 BeamOn shutter open 2.6_3.2kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6107 | on | 13:37:21 | 13:51:33 | peak sensing at low channel number |
6108 | on | 13:52:19 | 14:08:42 | spectroscopic amplifier 100->200 coarse amp. |
6109 | on | 14:09:21 | 14:55:48 | spectroscopic amplifier 200->500 coarse amp. |
6110 | on | 14:56:39 | 15:26:26 | spectroscopic amplifier 200->500 coarse amp. |
6111 | on | 15:30:40 | 15:56:29 | spectroscopic amplifier 200->500 coarse amp. |
6112 | on | 15:57:18 | 16:25:24 | spectroscopic amplifier 200->500 coarse amp. |
09/26/13 BeamOn shutter close 2.7_3.3kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6118 | on | 07:27:40 | 07:41:06 | peak sensing at ch#100, but ADC still has two peaks.ch# 1374 and ch#1553! voltage of GEM = voltage of cathode = 2.7kV, osciloscope does not show any signal for GEM. |
6122 | on | 08:22:59 | 09:01:28 | |
6123 | on | 09:03:21 | 09:44:26 | |
6124 | on | 09:51:51 | 10:22:48 | |
6125 | on | 10:26:06 | 10:59:21 | spec. amplif. changed 15-> 7.1 fine amp. 200 coarse overflow for Peak sensing |
6126 | on | 11:02:13 | 11:15:37 | spec. amplif. changed 7.1-> 7.4 |
6127 | on | 11:17:04 | 11:51:21 | overflow for Peak sensing |
6128 | on | 11:52:28 | 12:51:03 | overflow for Peak sensing |
6129 | on | 12:52:02 | 13:14:32 | overflow for Peak sensing
|
09/26/13 BeamOn shutter close 2.6_3.2kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6133 | on | 13:21:00 | 13:24:49 | peak sensing at ch#100, |
6134 | on | 13:26:23 | 13:30:20 | spec. amp 200->100 |
6136 | on | 13:33:18 | 13:43:14 | 9' 56" spec. amp 200->100 fine from 7.4 ->10 |
6138 | on | 13:47:19 | 13:57:10 | 10' 9" |
6140 | on | 14:00:55 | 14:10:55 | 10' |
6147 | on | 15:10:12 | 15:22:20 | spec. amp fine 10->5 |
6148 | on | 15:23:16 | 15:38:57 | spec. amp fine 5->7.4 |
6149 | on | 15:40:40 | 15:51:23 | |
6151 | on | 15:53:13 | 16:04:06 |
|
09/26/13 BeamOn shutter close 2.7_3.3kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6142 | on | 14:14:34 | 14:24:37 | 10' 3" differetnce between the peak of the two measurements is not enough to repeat using the new spc. amp new settings but the previous settings overflow the peak sensing!!! |
6144 | on | 14:29:47 | 14:40:35 | 10' 48" |
6145 | on | 14:44:10 | 14:55:24 | 11' 14" |
6146 | on | 14:56:14 | 15:07:50 | 11' 36" |
09/26/13 BeamOn shutter close 2.8_3.4kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6152 | on | 14:12:41 | 16:23:54 | 11' 13" |
6153 | on | 16:24:45 | 16:34:37 | 10' 48" |
6156 | on | 16:39:16 | 16:49:13 | 9' 57" |
6157 | on | 16:49:35 | 17:07:14 | 17'39" |
09/27/13 BeamOn shutter open 2.8_3.4kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6159 | on | 08:38:06 | 08:47:59 | 9' 53" |
6160 | on | 08:48:27 | 09:10:11 | 21 43" |
6161 | on | 09:11:10 | 09:21:25 | 10' 15" |
6162 | on | 09:23:23 | 09:33:18 |
|
09/27/13 BeamOn shutter open 2.7_3.3kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6163 | on | 09:34:52 | 09:42:01 | |
6164 | on | 09:42:34 | 09:59:17 | |
6165 | on | 09:59:49 | 10:28:55 | |
6166 | on | 10:29:31 | 10:45:57 |
|
09/27/13 BeamOn shutter open 2.6_3.2kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6167 | on | 10:47:49 | 11:00:06 | |
6168 | on | 11:00:46 | 11:13:33 | |
6169 | on | 11:14:31 | 11:24:36 | |
6170 | on | 11:25:15 | 11:29:34 | |
6171 | on | 11:30:22 | 11:41:52 |
09/27/13 BeamOn shutter open 2.7_3.4kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6172 | on | 11:45:35 | 11:55:27 | |
6173 | on | 11:55:49 | 12:03:25 |
09/27/13 BeamOn shutter open 2.7_3.2kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6174 | on | 12:04:42 | 12:13:11 | |
6175 | on | 12:13:30 | 12:22:40 |
09/27/13 BeamOn shutter open 2.7_3.1kV
ADC : GEM CH#5, Scintillator 9
TDC: GEM CH#27,31,28 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6176 | on | 12:24:58 | 12:50:30 |
09/27/13 BeamOn shutter open 2.8_3.4kV
TDC settings is changed for the scintillator.
Run Number | Beam | Start Time | End time | Notes |
6184 | on | 13:55:53 | 15:45:08 | shutter open |
6185 | on | 15:45:46 | 16:00:06 | shutter open |
6186 | on | 16:02:10 | 16:05:10 | shutter open |
6187 | on | 16:06:26 | 16:19:15 | shutter open |
6188 | on | 16:20:26 | 17:14:21 | shutter is close, ended 4 min. after the beam is off |
Analysis
Main points:
- TDC settings, comon start, common stop mode.
- TDC range.
- changing the TDC settings. and source of TDC hits. (logic fold and dual timer and the effect of the delay)
- The difference in time scale between the oold and the new TDC settings (scintillator time)
- write a program for direct analysis of neutron spectrum based on TDC and QDC, and TDC and Peak sensing ADC.
- The best best GEM operating voltage as the beam is ON.
- difference between the TDC histograms in the two ntuple root files.
The figure below shows the peak sensing ADC spectrum for shutter open (red) and shutter close (blue) as the beam is off.
ADC Charge calibration
Using Stanford pulse generator, a pulse is injected into the ADC with an appropriate amplitude to avoid the ADC saturation. pulse width is 36.4 +_ 0.4 us.
Run Number | pulse amplitude (mV) | Ch# |
6193 | 516+_ 4 | 2150 +_ 3 |
6194 | 624+_6 | 2929+_ 4 |
6195 | 724 +_ 8 | 3240+_ 4 |
6198 | 816+_ 8 | 3587+_ 2 |
6199 | 920 +_ 4 | 3.855+_ 6 |