12/12/12

Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.

HRRL_Dec_12_2012Run

12/13/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_13_2012Run


12/14/12

Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.

HRRL_Dec_14_2012Run

12/19/12

Target T1 goes in and Accelerator side lights up.

There is no Pb around T1. Lets directionally shield Illyusha to determine how much lead to add.

Area Conditions
800 \pm 130 pVs No shielding

|}