12 10 2012 HRRL DetectorTests
12/12/12
Worked on evaluating the background after the installation of 8" thick Pb wall in accelerator room and installing a FC, Scintillator, and Phosphorous screen at the end of the 90 degree line.
12/13/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.
12/14/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.
12/19/12
Target T1 goes in and Accelerator side lights up.
There is no Pb around T1. Lets directionally shield Illyusha to determine how much lead to add.