HRRL Positrons Jul 2012 Runs Setup
ADC inputs
Detector Left -> CH6
Detector Right -> CH5
Beam left Scintillator (between Q9 and Q10)-> CH9
Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.
Battery -> CH13.
Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.
TDC input
According to the setup on 27th:
CH0->start from the gun.
CH1->95 ns delay of the start from gun.