Beam Test Jul 27 2012
Jump to navigation
Jump to search
Beam Current Calibration of Scint Left
Determine if the Beam Left Scintillator is linear with beam current.
run# | FC1 | Scint Left (Ch9) | Reprate | start | stop | Int Rate | comments |
3696 | 2335 | 17:30:08 | 17:31:39 ( s) | 11 events/s | first measurement at full current | ||
3697 | 59 | 17:: | 17:: ( s) | events/s | cut the current in half | ||
3698 | 17:: | 17:: ( s) | events/s | ||||
3699 | 100 px | 17:: | 17:: ( s) | events/s |
1. T1 out, disable D1, send the beam to FC0, take scope image of the area.
2. T1 in, enable D1, bend the beam by 90 deg, take a run with 1000 events.