Beam Test Jul 18 2012
Jump to navigation
Jump to search
Tune up 2 MeV into 90 degree line
Check results from yesterday
Lower beam current so single pulses are observed in scintillator
Install thick scintillator for energy calibration
Tune
| Energy Switch | Out (High En) |
| Solenoid 1 | 6.2 A |
| Solenoid 2 | 3.3 A |
| Gun Hor | -0.2 A |
| Gun Ver | 0 A |
| Output Hor | -0.3 A |
| Output Ver | 0 A |
| Rep Rate | 8 |
| Gun HV | 10 (Knob Setting) |
| Gun Grid Voltage | 10 (Knob Setting) |
| RF frequency | 2856.320 MHz |
| Modulator HV Power Supply | 10 (Knob Setting) |
| RF macro Pulse Length (FWHM) | 300 ns |
| Q1 (A) | -3.7 |
| Q2 (A) | -5.5 |
| Q3 (A) | +0.6 |