Beam Text May 17 2012
Preparation
0. MATLAB emittance analysis: (working?) -- yes
1. Magnets: --Working
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good
3. Flags: --Working
4. Farady Cup: hocked up? --yes
5. Blank off for camera on? --good
6. Gas bottle for valve full? --Yes
7. Gas bottle for flags full? --Yes
8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline:
Check List Before Start
1) Valve exit of cavity opened?
2) Faraday cups are hocked up?
3) Camera in?
Energy Scan at 10 MeV
| Energy Switch | Out (High En Range) | 
| Dipole Coil Current | 33 | 
| e- Beam Energy () | 15.6004336 MeV (mapping ) | 
| Solenoid 1 | A | 
| Solenoid 2 | A | 
| Gun Hor | 0 A | 
| Gun Ver | 0 A | 
| Output Hor | 0.4 A | 
| Output Ver | 0.3 A | 
| Rep Rate | 6 | 
| Gun HV | 8.99(Knob Setting) | 
| Gun Grid Voltage | 10 (Knob Setting) | 
| RF frequency | 2856.291 MHz | 
| Modulator HV Power Supply | 4.84 (Knob Setting) | 
| RF macro Pulse Length (FWHM) | 300 ns | 
| Q1 (A) | 0 | 
| Q2 (A) | 0 | 
| Q3 (A) | 0 | 
| Q4 (A) | 0 | 
| Q5 (A) | 0 | 
| Q6 (A) | 0 | 
| Peak Current on FC 1 (45 deg) | 88.8 mAmps | 
| Peak Current on FC 2 (45 deg) | 26.4 mAmps | 
| Scope on FC 1 | 200 px | 
| Scope on FC 2 | 200 px | 
| Beam Spot | 200 px |