Beam Text May 17 2012
Jump to navigation
Jump to search
Preparation
0. MATLAB emittance analysis: (working?) -- yes
1. Magnets: --Working
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync? -- good
3. Flags: --Working
4. Farady Cup: hocked up? --yes
5. Blank off for camera on? --good
6. Gas bottle for valve full? --Yes
7. Gas bottle for flags full? --Yes
8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline:
Check List Before Start
1) Valve exit of cavity opened?
2) Faraday cups are hocked up?
3) Camera in?