Beam Text May 17 2012
Preparation
0. MATLAB emittance analysis: (working?)
1. Magnets: --Working
2. Camera: (a)--Working, (b)--shielding-good,(c) Sync?
3. Flags: --Working
4. Farady Cup: hocked up?
5. Blank off for camera on?
6. Gas bottle for valve full? --Yes
7. Gas bottle for flags full? --Yes
8. 3 Pickup Coils (Green Torroids): (1)@gun: hocked-up; (2)@accelerator exit: hocked-up to 2 red strip wire. Now connected to linac monitor panel which labeled as "J12 from back", "Scan field Mon" from front. (3)@end of beamline: