September 21, 2011
Beam Parameters:
- current 160 mA
- pulse width <2 ns
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|---|
| 2515 | Up 90A | In | Open | In | Yes | Out | DU cylinder | Test radiator in/out. 144632 pulses | 
| 2517 | Up 90A | In | Open | In | Yes | In | DU cylinder | Test radiator in/out. 0 pulses | 
| 2519 | Down 86A | In | Open | In | Yes | In | DU cylinder | Test radiator in/out. 0 pulses | 
| 2520 | Down 86A | In | Open | In | Yes | Out | DU cylinder | Test radiator in/out. 162652 pulses | 
Production Runs
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|---|
| 2521 | Up 90A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (60 minute run) R(bottom) = 7.64E-4 n/pulse  -> × 180 Hz × 60 sec/min =  8.25 n/min | 
| 2522 | Up 90A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) R(bottom) = 6.75E-4 n/pulse  -> × 180 Hz × 60 sec/min =  7.29 n/min | 
| 2523 | Down 86A | In | Open | In | Yes | In | DU cylinder | Long production run: 649324 pulses (60 minute run) R(bottom) = 5.1E-4 n/pulse -> × 180 Hz × 60 sec/min =  5.54 n/min | 
| 2524 | Down 86A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) R(bottom) = 4.58E-4 n/pulse -> × 180 Hz × 60 sec/min =  4.95 n/min | 
| 2525 | Down 86A | In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (30 minute run) R(bottom) = 1.7E-5 n/pulse ->  × 180 Hz × 60 sec/min =   0.18 n/min | 
| 2526 | Up 90A | In | Open | In | Yes | In | None | Long production run: 655450 pulses (60 minute run) R(bottom) = 1.68E-5 n/pulse ->  × 180 Hz × 60 sec/min =   0.18 n/min |