September 22, 2011
Beam Parameters:
- current 140 mA
- pulse width 2 ns
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
Run # | Beam | Dump magnet | Collim | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2527 | Up 90A |
In | Open | In | Yes | In | D2O buttle | Test radiator in/out.
-- pulses |
2528 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
-- pulses |
2530 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
-- pulses |
2530 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
-- pulses |
Production Runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
25-- | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |
25-- | Down 86A |
In | Open | In | Yes | In | None | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |