September 21, 2011
Beam Parameters:
- current 160 mA
- pulse width <2 ns
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2515 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
144632 pulses |
2517 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2519 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
0 pulses |
2520 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
162652 pulses |
Production Runs
Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|---|
2521 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (60 minute run) R(bottom) = 7.64E-4 n/pulse -> × 180 Hz × 60 sec/min = 8.25 n/min |
2522 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) R(bottom) = 6.75E-4 n/pulse -> × 180 Hz × 60 sec/min = 7.29 n/min |
2523 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: 649324 pulses (60 minute run) R(bottom) = 5.1E-4 n/pulse -> × 180 Hz × 60 sec/min = 5.54 n/min |
2524 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) R(bottom) = 4.58E-4 n/pulse -> × 180 Hz × 60 sec/min = 4.95 n/min |
2525 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (30 minute run) R(bottom) = 1.7E-5 n/pulse -> × 180 Hz × 60 sec/min = 0.18 n/min |
2526 | Up 90A |
In | Open | In | Yes | In | None | Long production run: -- pulses (60 minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min = -- n/min |