September 20, 2011
summary what was been done
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
|---|---|---|---|---|---|---|---|---|
| 2502 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
120664 pulses |
| 2503 | Up 90A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
121258 pulses |
| 2504 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Test radiator in/out.
R(bottom) = 0.00137 n/pulse -> ×180×60 = 14.8 n/min |
| 2505 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Test radiator in/out.
122247 pulses |
Production runs
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 10 um Al | Target | Comments |
|---|---|---|---|---|---|---|---|---|
| 2506 | Up 90A |
In | Open | In | Yes | In | DU cylinder | Long production run. Operator said the beam is really jittery
972556 pulses |
| 2507 | Down 86A |
In | Open | In | Yes | In | DU cylinder | Long production run. Operator said the beam is really jittery
973769 pulses |
| 2508 | Down 86A |
In | Open | In | Yes | Out | DU cylinder | Long production run. Operator said the beam is really jittery
pulses |