September 16, 2011
Revision as of 15:01, 16 September 2011 by Shaproma (talk | contribs) (→summary what was been done)
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2459 | Up 90A | In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 1/160279 = 0.0000062 n/pulse |
2460 | Down 86A | In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0/160279 = 0 n/pulse |
2461 | Down 86A | In | Open | Yes | Down | DU cylinder | Beam check-in run.
R(beam down) = n/pulse |