September 15, 2011

From New IAC Wiki
Revision as of 14:54, 16 September 2011 by Shaproma (talk | contribs)
Jump to navigation Jump to search

go back


The view flag was lost. So the vacuum was broken. During that time:

  • the radiator was reinstalled so we have now both 10um and 25 um of Al radiator.
  • radiator was recalibrated
  • The collimation system and target was more precisely realign.
  • The to left and right side 90 detectors was realign so now they are at the same level


Radiator calibration

from the top: