September 7, 2011
Revision as of 15:15, 7 September 2011 by Shaproma (talk | contribs) (→Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On.)
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.
Current Connection
- upstream: A5
- downstream: A6