FC calibration 25 MeV 3/4/11
Jump to navigation
Jump to search
Below is the FC calibration by using view screen observation for 44 MeV setup (runs 1848-1867)
Here are:
- red line is the fitting line for beam up
- green line is the fitting line for beam down
- black line is the fitting line for beam up and down
We can see that all three line is almost the same so we can use the fitting line for whole range of kicker magnet which is