Sadik Log Book
2010-02-24
Go to IAC research facility near airport collect:
2) 2 KiwiDipole
3) Power supplies: 110 V is preferred, at lest 3, at most 13 (one for each magnet). Need to test before taking, see if they work.
Check for the link IAC_positron_beamline for magnets and power supplies descriptions.
2010-02-25
All on the list of 2010-02-24 are in physics beam lab, except 6 Quad2A which will be delivered by IAC research assistant Dillon tomorrow morning.
Next step is to test these power supplies see if they work.
2010-03-13-14
Measure magnetic field strength as function of current dB/dI.
1) Type 1 Quad (also Quad2A )
2) Type 2 Quad (also Quad2T )
2010-03-27
Measurement on magnetic field strength as function of current dB/dI were done. And Fitting function for was data created.
1) Type 1 Quad (also Quad2A )
2) Type 2 Quad (also Quad2T )
done: http://wiki.iac.isu.edu/index.php/Instruments_and_Equipments
2010-05-17
Need to simulation on HRRL radiation. Place a cylindrical detector near corner of the wall 1 measure total photon and electron energy deposited. In simulation, place cylindrical lead (Pb) shield around HRRL, and see the change on the energy, if I change the thickness of that shield. This need to be done for both new and old (original) position of HRRL, so I can compare the ratio of the total energy deposited (electron and photon energy mixed) in new position to old position. Propose of this simulation is by comparing energy ratio, we have idea of radiation dose will be deposited on the cylindrical detector near the corner of wall 1.
2010-05-20
http://wiki.iac.isu.edu/index.php/HRRL_CHIPS_Logbook#5.2F20.2F10
2010-06-04
1.)Emmittance measurement.
move magnet power supplies to Accelerator operator post
Map quads
need to design beamline for test
install wiring for at least 2 quads in the HRRL which you will use for emmittance test
2.) Simulation
3.)Calculate impact of beam on Tungsten target in Vacuum
HRRL_Postron_Rotating_W_Target
Go back to User:Sadik82
2010-06-06
1) Finsh job on 2010-06-04
2) Finish simulation and plot them. (done)
3) Fix the moving plan plot and write the proposal.
4) Put the rack next to the other racks and put the power supplies in it.
5) Finish calculation on two radiation experiments.
June/15/2010
1.)Emmittance measurement.
move magnet power supplies to Accelerator operator post ( 2 new supplies are in position, a box will be installed to hold 4 more new supplies) The rest of the space will be filled with the old, large, heavy power supplies as spares.
Ask kevin or chad about 120 Volt AC electrical connection for power supplies. Do we have multiple circuits to avoid tripping the circuit breakers.?
Map quads Instruments_and_Equipments#Mapping_Quadruple_Megenets
Create an input file for Optim32 which represent the beam line for the emmittance measurements as shown at Emittance_Test.
install wiring for at least 2 quads in the HRRL which you will use for emmittance test
2.) Simulation
3.)Calculate impact of beam on Tungsten target in Vacuum
HRRL_Postron_Rotating_W_Target
Go back to User:Sadik82