Experimental setup

From New IAC Wiki
Revision as of 16:41, 17 April 2008 by Oborn (talk | contribs)
Jump to navigation Jump to search

Exp setup1.jpg

Figure 1: 8:21 am - 40mAmps pulse, 200 ns, 300 Hz, 103secs of beam, 6 fissions. 9:10 am - Threshold 80 mV, NT1=17.6counts/10min.

Exp setup2.jpg

Figure 2: ΔT=200ns, Ie=40mA, f=300Hz, Ee=20MeV, q=8.7nC/pulse. NT1=12counts/10min, NT2=35counts/10min

Exp setup3.jpg

Figure 3: ΔT=200ns, Ie=40mA, f=300Hz, Ee=20MeV, q=8.7nC/pulse. NT2=46counts/10min, threshold = 80 mV, PB=33.9

Exp setup4.jpg

Figure 4: ΔT=200ns, Ie=40mA, f=300Hz, Ee=20MeV, q=8.7nC/pulse. NT248counts/10min, NT1(thresh=30mV,beamon)=1065counts/10min, threshold = 80 mV, PB=33.9


Exp setup5.jpg

Figure 4: This new architecture is used for obtaining timing spectra during runs 60 - 63 (http://www.iac.isu.edu/mediawiki/index.php/Timing_spectra), PB=3.97Torr, PC=4.5Torr

Exp setup6.jpg