IAC 1-4-08

From New IAC Wiki
Revision as of 16:13, 18 February 2008 by Oborn (talk | contribs)
Jump to navigation Jump to search

Today we installed the drift chambers and had our first beam on target.

DC HV and Gas

90/10 ArCo2

HV settings
Wire Volts current ([math]\mu[/math]A)
Sense 1500
Field -750
Guard 750

Apparatus

DC Config 1-4-08.jpg


Alignment

We put an aluminum brick in front of the electron beam in order to look at photons hitting the Drift Chamber. We saw a signal out of the drift chamber once for every 10 gun pulses.

200 px 200 px

Go Back