Setup a cosmic coincidence experiment with two crossed scintillators that have the proto-type drift chambers sandwhiched between them.
Built 4 100 ns long delay cables. 2 for the PMTs and one for sense wire 7 on each of the drift chambers.
The top PMT is in channel 7 of the QDC and channel 16 of the scaler.
The Bottom PMT is on channel 8 of the QDC and channel 7 of the scaler.
Coincidence counts are recorded in channel 2 of the scaler.
Runs
Drift Chamber is off
Run 182: Ran with coincidence module in "OR" mode so if either paddle triggered the ADC was read out
Run 183: Switched coincidence module to "AND" mode and ran overnight.
12/23/07
Drift Chamber turned on with 90/10 ArCO2 and the voltages below
HV settings | ||
Wire | Volts | current ( | A)
Sense | 1500 | 19 |
Field | -800 | 19 |
Guard | 800 | 0 |
Run 204: Scope was plugged into DC output (split signal)
12/24/07
Run 206: Unplugged scope and started this run
Drift Chamber turned on with 90/10 ArCO2 and the voltages below
HV settings | ||
Wire | Volts | current ( | A)
Sense | 1500 | 19 |
Field | -800 | 19 |
Guard | 800 | 0 |