IAC positron beamline

From New IAC Wiki
Revision as of 18:07, 9 November 2007 by Oborn (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (Dipole 2) begins after Quad 1 and Quad 2. Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.


IAC 25MeV 90DegreeBend 11-08-07.jpg

The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..

IAC 25MeV Dipole1 11-08-07.jpg


IAC 25MeV Dipole1 Label 11-08-07.jpg