CH PAS Master Logbook

From New IAC Wiki
Revision as of 20:38, 23 January 2022 by Harpconn (talk | contribs) (→‎Ignore)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Every run I perform will eventually be logged here. If I don't have record of it here, then it's irrelevant

Run Table

Run Number Detector Type Setup Description Discriminator Threshold (mV) Source (Type and Location) Converter Start Time & Date End Time & Date RCGUI Events Plot/Notes
7031 NaI NaI detector 30cm from converter placement 2mV Cf252 @ 10cm Gadolinium 13:01:51 7/21/21 13:12:07 7/21/21
7033 NaI NaI detector in detector tunnel, 30cm from converter placement 2mV Cf252 @ 10cm None 13:17:30 7/21/21 13:27:27
7034 He3 He3 spanning length of detector tunnel 255mV Cf252 @ 10cm None 15:46:25 7/21/21 15:57:38 7/21/21
7035 He3 He3 spanning length of detector tunnel 255mV Cf252 @ 10cm Gadolinium 16:01:34 7/21/21 16:11:28 7/21/21
7061 NaI NaI detector ~1mm from converter placement 2mV Cf252 @ 20cm None 10:27:35 8/5/21 10:32:54 8/5/21 419627
7062 NaI NaI detector ~1mm from converter placement 2mV Cf252 @ 20cm Gadolinium 10:41:45 8/5/21 10:46:56 8/5/21 407700
7063 NaI NaI detector ~1mm from converter placement 50mV Cf252 @ 20cm Gadolinium 11:02:42 8/5/21 11:07:52 29669
7064 NaI NaI detector ~1mm from converter placement 50mV Cf252 @ 20cm None 11:12:41 8/5/21 11:17:54 8/5/21 24076
7065 NaI NaI detector ~1mm from converter placement 2mV Cf252 @ 20cm Gadolinium 13:07:04 8/5/21 13:13:45 8/5/21 360169
7066 NaI NaI detector ~1mm from converter placement 2mV Cf252 @ 20cm None 13:17:39 8/5/21 13:22:45 8/5/21 276203
7074 NaI NaI detector ~1mm from converter placement 2mV None None 16:28:52 8/6/21 10:09:00 8/9/21 2073152
7082 HPGe HPGe detector ~1mm from converter placement Cs137 source for initial calibration on top of HPGe Gadolinium 16:40:33 8/19/21 10:50:29 8/20/21 5649754
7083 HPGe HPGe detector ~1mm from converter placement Cs137 source for initial calibration on top of HPGe Gadolinium 15:17:46 8/20/21 15:39:44 8/20/21 35932
7086 HPGe HPGe detector ~1mm from converter placement Cs137 source for initial calibration on top of HPGe Gadolinium 8263 (Unix) 8/20/21 7577 (Unix) 8/20/21
7087 HPGe HPGe detector ~1mm from converter placement Cs137 source for initial calibration on top of HPGe Gadolinium 9034 (Unix) 8/20/21 8423 (Unix) 8/20/21
7088 HPGe HPGe detector ~1mm from converter placement Cs137 source for initial calibration on top of HPGe None
7089 HPGe HPGe detector ~1mm from converter placement 50mV Cs137 source for initial calibration on top of HPGe None 17:00:15 8/20/21 14:23:57 8/23/21 2678913
7090 HPGe HPGe detector ~1mm from converter placement, amplification sets ~1KeV/channel 255mV None None 14:23:46 8/24/21 14:44:58 8/24/21 3784
7091 HPGe HPGe detector ~1mm from converter placement, amplification sets ~1KeV/channel 255mV Cs137 None 15:27:05 8/24/21 15:31:50 8/24/21 845 No visibile Cs137 line




| || || || || || || || || || |-

Ignore

Isotope Name Half Life Capture Gamma Lines (int > %)
Energy (KeV) Intensity



Previous Page

CaGaS Phase II

PAS Feasibility Study Runs